RHI Pros logoRHI Pros
Emergency damage?Call (484) 706-9229Restoration help

Project Gallery

Case studies tagged bathroom remodeling. Show all projects

Bathroom Remodeling case studies

Sink and mirror wall after renovation with updated surfaces and lighting-ready finishes.

Allentown, PA

Commercial Bathroom Renovation in Allentown

High-traffic restroom and corridor refresh: worn surfaces and dated finishes were replaced with durable materials and a cleaner, more professional presentation end to end.

  • Refresh restroom stalls, fixture areas, and visible finish surfaces
  • Update hallway walls, ceilings, and flooring for a cleaner presentation
View full case study
Finished bathroom after remodel with gray vanity, black fixtures, and new door addition.

Bethlehem, PA

Bathroom Refresh in Bethlehem

Practical bathroom upgrade focused on durable materials, better storage, and clean finish quality.

  • Vanity and fixture replacement
  • Moisture-aware wall and floor finishes
View full case study
Before and after layout board for a beige neutral bathroom refresh showing planned finishes and sight lines.

Lehigh Valley, PA

Beige Neutral Bathroom Refresh in the Lehigh Valley

A warm, neutral beige bathroom direction with cleaner sight lines and updated finishes. Before and after layout boards here were used to align on materials, fixtures, and the overall look before construction.

  • Finish and fixture refresh in a compact bathroom footprint
  • Coordinated beige/neutral palette across tile, paint, and accents
View full case study
Bathroom after remodel with vanity, mirror, and wall finishes in the finished half bath.

Berks County, PA

Bathroom Remodel in Berks County

Half-bath refresh: darker dated finishes were swapped for a brighter, modern palette with a coordinated vanity, wall, and floor package in a compact footprint.

  • Vanity, fixture, and finish replacement
  • Moisture-aware prep in wet-adjacent zones
View full case study
Doorway view of the finished Hamburg laundry and half-bath with gray flooring and charcoal washer.

Hamburg, PA

Laundry and Half-Bath Remodel in Hamburg, PA

A tight Hamburg laundry and half-bath was rebuilt into one brighter utility room with new flooring, finishes, storage, and a clear bath zone.

  • Finish reset in a combined laundry and half-bath footprint
  • Flooring, paint, trim, and lighting for a brighter daily-use space
View full case study

More bathroom remodeling photos

Extra angles from the bathroom remodeling case studies above. These are not the same images as the card thumbnails.

Finished commercial restroom stall run after renovation in Allentown.
Restroom floor zone after refresh with durable finish and cleaner transitions.
Finished bathroom shower enclosure after remodel.
Second before and after layout view for the same beige bathroom refresh direction.
Vanity with stainless utility sink, white toilet, and light wood shelving after remodel.
Full view of the remodeled laundry bathroom with washer, open shelves, and LED ceiling light.
Finished white window trim and roller shade beside the laundry appliance.

Want results like these for your home?

Tell us about your project and we will scope a plan based on your goals, budget, and needs.